Weeks 5-6: Integration and Freeze
Dates: Oct 10 - Oct 23
These weeks are about turning separate subsystems into one reliable robot and reducing last-minute redesign risk. Students should shift from adding ideas to improving consistency.
EDP Stages
- Test and Evaluate
- Refine and Optimize
- Implement and Produce
What Students Should Do
- Integrate mechanisms, wiring, and code into the same robot
- Run repeated autonomous and teleop tests
- Collect simple performance data such as cycle time and success rate
- Fix reliability problems before adding anything new
- Stop major hardware additions by the Oct 23 build freeze target
- Review portfolio content and update documentation with final iterations
- Begin focused driver practice on the robot that will actually compete
What This Looks Like in a Team Meeting
- Test the full robot, not just one subsystem at a time
- Run the same test multiple times and write down the results
- Fix repeated failures before chasing new features
- Practice with the robot configuration that is actually going to competition
- Decide what is frozen and what is still allowed to change
Suggested Student Outputs
- Test logs with success rates or cycle times
- A short list of reliability issues and fixes
- A build freeze checklist
- Finalized mechanism and wiring layout
- Updated portfolio pages showing iteration and evidence
By the End of Week 6, Students Should Be Able To Say
- Our robot can perform its key tasks consistently.
- We have data, not just opinions, about how well it works.
- We know what problems still remain.
- We are practicing on the robot we plan to compete with.
Student Learning Focus
- Learn that full-system performance matters more than isolated subsystem success
- Practice using data to guide improvements
- See how mechanical, electrical, and software decisions affect each other
Good Weekly Questions
- Does the full robot still work well when everything is connected?
- Which failures happen repeatedly?
- What should we improve now, and what should we leave alone?
- Are we ready to freeze the design and practice with consistency?
Quick Team Checklist
- We tested full robot workflows multiple times.
- We recorded cycle time, success rate, or other useful data.
- We fixed repeated problems before adding new features.
- We agreed on our build freeze date and what it means.
Important Team Rule
After build freeze, do not keep adding new features unless a change is necessary to restore reliability or meet a clear requirement.